A Marini asphalt plant in the Middle East
2019-2-20 · A 'giant' rises up in the middle of the desert. With its 320 ton storage capacity and 260 t/h production rate, the newly commissioned TOP TOWER 3000 P batch mix asphalt plant delivered to United Gulf Construction (UGCC) for the refurbishment of road and interchanges on the existing 6th Ring Road, in Kuwait, is without any doubts well visible from far away thanks to its 30 meter height.
Get Price